  • 100 kpph
  • Demolition of 2 x B&W boilers @ 50,000 lb/hr ea.
  • Demolition of existing Cooling Towers #1 and #2 (5,200 TR)
  • Installation of one (1) new water-tube boiler, rated @ 100,000 pph
  • Installation of new 5-cell cooling tower (6,100 TR)
  • Upgrade to 13.8 kV Keele Substation

CEM Responsibilities

  • Preparation of 50% grant application
  • Design Basis Report
  • Schematic Design
  • Design Development
  • Contract Documents
  • Issued for Tender/Issued
  • for Construction Drawings
  • Contract Administration services during construction and commissioning