York University
- 100 kpph
- Demolition of 2 x B&W boilers @ 50,000 lb/hr ea.
- Demolition of existing Cooling Towers #1 and #2 (5,200 TR)
- Installation of one (1) new water-tube boiler, rated @ 100,000 pph
- Installation of new 5-cell cooling tower (6,100 TR)
- Upgrade to 13.8 kV Keele Substation
CEM Responsibilities
- Preparation of 50% grant application
- Design Basis Report
- Schematic Design
- Design Development
- Contract Documents
- Issued for Tender/Issued
- for Construction Drawings
- Contract Administration services during construction and commissioning