K+S Windsor Salt

This project consists of a 3.5 MWe Solar Turbine Gas Turbine Generator, complete with a 90,000 lb/hr Heat Recovery Steam Generator (Rentech). The project features future fresh air firing capability; dual fuel; electrical islanding capability and features an outdoor installation.

CEM was responsible for the design, procurement of major equipment, construction of the system, as well as commissioning.