International Wax
Detailed Engineering Study, Front-End Engineering and Design and Detailed Engineering
- 3.5 MWe GTG based CHP system/ 90,000 lbs/hr HRSG
- Solar Centaur 40 Gas Turbine
- Electrical islanding
- Future condensing economizer
Detailed Engineering Study, Front-End Engineering and Design and Detailed Engineering