Fraser Valley Biogas – CEM Engineering Skip to content
LinkedInFacebookInstagramXYouTubeEmailApple PodcastsApple PodcastsAnchorAnchor
CEM Engineering Logo CEM Engineering Logo
  • HOME
  • ABOUT US
  • POWER & UTILITIES
  • BIOGAS/ RNG
  • HYDROGEN
  • MEDIA
    • PODCAST
    • NEWS & BLOG
    • VIDEO
  • CONTACT
Fraser Valley Biogasmarc2024-05-14T15:12:45+00:00

Fraser Valley Biogas

This project consists of three (3) Anaerobic Digesters @ 2,700 m3 each (2 primary + 1 secondary) with a pressure swing absorption system to remove CO2/H2S. The inputs include organic by-products from a nearby potato chip plant; agricultural by-products (potatoes, vegetables); and manure from 1,000 cows and 1.5 million chickens. The system produces 240 – 800 m3/hour of biogas, with 50,000 GJ/year of carbon neutral RNG.

CEM responsible for electrical engineering and key members of the CEM team were heavily involved in development and implementation of biogas system (while with PlanET Biogas Solutions)

Contact Us

St.Catharines 905-935-5815
Burlington 289-205-2915
Alberta 587-317-2727
info@CEMeng.ca

Energy Radio Podcast

Get Social

COPYRIGHT 2020 |  ALL RIGHTS RESERVED   |   POWERED BY CEM Engineering
Page load link
Go to Top