Bayview Flowers – CEM Engineering Skip to content
LinkedInFacebookInstagramXYouTubeEmailApple PodcastsApple PodcastsAnchorAnchor
CEM Engineering Logo CEM Engineering Logo
  • HOME
  • ABOUT US
  • POWER & UTILITIES
  • BIOGAS/ RNG
  • HYDROGEN
  • MEDIA
    • PODCAST
    • NEWS & BLOG
    • VIDEO
  • CONTACT
Bayview Flowersmarc2024-01-09T18:38:04+00:00

Bayview Flowers

  • 0.25 MW CHP – ICE + Biogas, completed in 2006
  • 2 Anaerobic Digesters @ 1,200 m3 each
  • 1 biogas ICE Cogen Genset @ 250 kWe and 250 kWt
  • one 1 Dry Feeder @ 15 m3.
  • Input Materials included Dairy Manure; Corn Silage; Dry Grain-Based Animal Food; Grain Corn; Glycerine; Potato Culls; Greenhouse Clippings.

  • CEM Responsibilities

    • Early Technical and Economic Feasibility Studies; subsequent detailed engineering and construction management services
    • Managed all Permits and Approvals, Building Permits, and liaison with Ministry of Environment
    • Managed Certificate of Approval, accounting for air and noise emissions
    • Provided engineering support and project management services for major equipment selection and procurement.
    • CEM was responsible for hot water tie-in to existing greenhouse loads and hot water loop for digester heating; biogas piping, biogas boiler fuel train, and biogas blower to engine genset and greenhouse boiler system.
    • Obtaining approval from TSSA for biogas fuel system and piping
    • Design of biogas clean up system, to ensure biogas meets quality requirements of engine.
    • Facilitated Net-Metering arrangement with Peninsula West Utilities; arranged installation of second revenue grade meter for RESOP Contract
    • Prepared RESOP application to the OPA.

    Contact Us

    St.Catharines 905-935-5815
    Burlington 289-205-2915
    Alberta 587-317-2727
    info@CEMeng.ca

    Energy Radio Podcast

    Get Social

    COPYRIGHT 2020 |  ALL RIGHTS RESERVED   |   POWERED BY CEM Engineering
    Page load link
    Go to Top