Niagara Hydrogen Centre

This project will feature a Cummins 20 MW proton-exchange-membrane (PEM) electrolyzer system and capacity to produce up to approximately 2,000 tonnes of H2/year and will be the largest green hydrogen production facility in Ontario, providing industrial consumers with low-carbon hydrogen for immediate consumption, including Atura Power’s owned and operated combined cycle gas turbine (CCGT) plants.

CEM Responsibilities

CEM is the owner’s engineer and has the responsibility to complete the detailed design and advance the project permitting, while also supporting Atura in the technical selection of key project equipment and technology.